INFRASTRUCTURE & MISC

ECO Park Housing Scheme


Project

 

ECO Park Housing Scheme “Sheikhu Garden”


Location

 

Sheikhupura, Lahore


Architect/Client

 

 


Owner

 

 


Status

 

Completed (2011)


Built-up Area

 

2,400,000.00 SFT


Project Brief

 

Residential Housing Scheme & Commercial Plots


Scope of Works

 

 

Design Study, Preparation of Bill of Quantities, Costing with Rate Analysis, Raised Quarries from Designed Drawings, Preparation of Design Report for HT, LT, Tele-Communication & Allied Works as per WAPDA/LESCO Specifications/standard

 

Karachi School of Business & Leadership (KSBL)


Project

 

Karachi School of Business & Leadership (KSBL)


Location

 

City Campus, Stadium Road, Karachi


Architect/Client

 


Owner

 


Status

 

Completed (2012)


Built-up Area

 

 


Project Brief

 

 


Scope of Works

 

Preparation of Shop Drawings & Site Visits for Electrical, ELV Systems & Allied Works

Multi Purpose Hall & Utilitarian Building


Project

Multi Purpose Hall & Utilitarian Building


Location

IBA – Main Campus, Karachi


Architect/Client



Owner



Status

Completed (2010)


Built-up Area

5,850 SFT


Project Brief

 


Scope of Works

Preparation of As-Built Drawings of Electrical, ELV System & Allied Works

S.O.S Village


Project

 

S.O.S Village


Location

 

Jamshoro, Sind


Architect/Client

 

 


Owner

 

 


Status

 

Completed


Built-up Area

 

 


Project Brief

 

 


Scope of Works

 

Design, Coordination for HT, LT Cable Networks, Sub-Stations, HT, LT Distribution Boards & Panels as per WAPDA/HESCO Requirements

Kitchen, Staff & Store Building


Project

 

Kitchen, Staff & Store Building


Location

 

IBA – Main Campus, Karachi


Architect/Client

 

 


Owner

 

 


Status

 

Completed (2010)


Built-up Area

 

3,050 SFT


Project Brief

 

 


Scope of Works

 

Preparation of As-Built Drawings of Electrical, ELV System & Allied Works

Boys Hostel, Academic & CCS Building


Project

Boys Hostel, Academic & CCS Building


Location

  1.  Main Campus


Architect/Client

 


Owner

 


Status

Completed (2010)


Built-up Area

50,953 SFT 8,100 SFT & 6,375 SFT (Total: 65,428 SFT)


Project Brief

 


Scope of Works

Preparation of As-Built Drawings of Electrical, ELV System & Allied Works

Capri Data Centre


Project

 

Capri Data Centre


Location

 

Executive Tower, Dolmen City, Clifton, Karachi


Architect/Client

 

 


Owner

 

 


Status

 

Completed (2011)


Built-up Area

 

 


Project Brief

 

 


Scope of Works

 

Survey & Preparation of Design Reports for Existing and New Electrical, ELV Systems & Air-Conditioning Works

List of Projects Completed at S.K. Engineers:

Air Traffic Management (ATM) System


Project

 

Air Traffic Management (ATM) System


Location

 

Allama Iqbal International Airport, Lahore


Architect/Client

 


Status

 

Completed (2012)


Built-up Area

 

N/A


Project Brief

 

Turnkey Project (Replacement of Existing Radar System)


Scope of Works

 

Design Development, Execution & Project Management for Radar Equipment Replacement, Electrical, ELV Systems & Allied Works

Air Traffic Management (ATM) System

Project

Air Traffic Management (ATM) System

Location

Jinnah International Airport, Karachi

Architect/Client

 

Status

Completed (2011)

Built-up Area

N/A


Project Brief

 

Turnkey Project (Replacement of Existing Radar System)


Scope of Works

 

Design Development, Execution & Project Management for Radar Equipment Replacement, Electrical, ELV Systems & Allied Works

Bolan Mining Enterprises (BME)


Project

 

Bolan Mining Enterprises (BME) New Grinding Mill-2


Location

 

BME House, Model Town, Khuzdar, Balochistan


Architect/Client

 

 


Status

 

Completed (2011)


Built-up Area

 

10,080 SFT


Project Brief

 

Turnkey Project
Scope of Works

 

Design Development, Execution, Project Management for Electrical & Allied Works

 

Tethyan Copper Company (TCC)


Project

 

Tethyan Copper Company (TCC) RIKO DIQ Gold & Copper Mining Project


Location

 

Koh-e-Daleel Mountain, Chagai District, Balochistan


Architect/Client

 

 


Status

 

Completed (2010)


Built-up Area

 

 


Project Brief

 

Turnkey Project
Scope of Works

 

Design Development, Execution & Project Management of Electrical Works, Deputation of Manpower & Technical Teams for Electrical Power Generation & Distribution Systems

 

Overseas Investors Chamber of Commerce & Industry (OICCI)


Project

 

Overseas Investors Chamber of Commerce & Industry (OICCI)


Location

 

Talpur Road, Seari Quarters, Karachi


Architect/Client

 

 


Status

 

Completed (2009)


Built-up Area

 

 


Project Brief

 

Turnkey (Ground Floor)


Scope of Works

 

 

Up-Grading and Refurbishment of Air-Conditioning and Ventilation System

 

Fish Meal Processing Unit


Project

 

Fish Meal Processing Unit


Location

 

Karachi


Architect/Client

 


Status

 

Completed (2011)


Built-up Area

 

 


Project Brief

 

 
Scope of Works

 

Cost Estimation of Electrical HT & LT Distribution Network

 

IBA External Development


Project

 

IBA External Development


Location

 

Main Campus, Karachi


Architect/Client

 

 


Status

 

Completed (2010)


Built-up Area

 

Various Areas


Project Brief

 

Substation Upgradation & Walkways
Scope of Works

 

Design Development of Electrical Works, Tender Documentation & Top Supervision

 

Construction of Coal & Clinker/Cement Terminal


Project

 

Construction of Coal & Clinker/Cement Terminal


Location

 

Pakistan International Bulk Terminal (Pvt.) Ltd. (PIBT), Port Qasim, Pakistan


Architect/Client

 

 


Status

 

Completed (2011)


Built-up Area

 

 


Project Brief

 

 


Scope of Works

 


Detail Engineering, Preparation of BOQ, Cost Estimation & Preparation of Technical Submittals for Electrical MV, LV & Telecommunication Systems

 

Attock Refinery Limited (ARL)


Project

 

Attock Refinery Limited (ARL)


Location

 

Khyber Pukhtoonkhwa


Architect/Client

 

 


Status

 

Completed (2011)


Built-up Area

 

 


Project Brief

 

 


Scope of Works

 

Cost Estimation of Electrical, ELV Systems, Instrumentation & Allied Works

Waste Treatment and Disposal System


Project

 

Waste Treatment and Disposal System


Location

 

Zamzama Gas Plant


Architect/Client

 

 


Status

 

Completed (2011)


Built-up Area

 

 


Project Brief

 

 


Scope of Works

 

Cost Estimation of Electrical, ELV Systems & Allied Works

Gorakh Hill


Project

 

Gorakh Hill


Location

 

Pakistan


Architect/Client

 

 


Status

 

Completed (2010)

 

Built-up Area

 

 


Project Brief

 

Stage-B Development


Scope of Works

 


Design for Electrical Infrastructure HT, LT, Communication Systems, Allied Works & Tender Documentation

 

Marathon Construction (Pvt.) Ltd


Project

 

Marathon Construction (Pvt.) Ltd


Location

 

Phase VI, PDOHA, Karachi


Architect/Client

 

 


Status

 

Completed (2011)


Built-up Area

 

 


Project Brief

 

 


Scope of Works

 

Electrical Existing Infrastructure Audit, Proposed Design Development of Electrical, ELV Systems & Allied Works for Existing & Proposed Power Distribution Systems

SIPCA Pakistan Ltd.


Project

 

SIPCA Pakistan Ltd.


Location

 

Malir Halt, Karachi


Architect/Client

 

 


Status

 

Completed (2011)


Built-up Area

 

 


Project Brief

 

Turnkey


Scope of Works

 

Testing of Existing K-Electric 11kV Metering Panel & hook-up new 11kV Panel & Allied Works on Newly Constructed Area

Co-Generation Through Recovering Heat from Exhaust of Simple Gas Fired Turbine


Project

 

Co-Generation Through Recovering Heat from Exhaust of Simple Gas Fired Turbine


Location

 

Kandhkot Gas Field in Pakistan Petroleum


Architect/Client

 

 


Status

 

Completed (2011)


Built-up Area

 

 


Project Brief

 

 


Scope of Works

 

Cost Estimation of Electrical

Mari Gas Company Limited (MGCL)


Project

 

Mari Gas Company Limited (MGCL)


Location

 

Daharki


Architect/Client

 

 


Status

 

Completed (2008)


Built-up Area

 

312,000 SFT


Project Brief

 

 
Scope of Works

 

Design Development of External Lighting, Power & Control Distribution, ELV Systems, Allied Works & Tender Documentation

 

Air Strip Extension Lighting


Project

 

Air Strip Extension Lighting


Location

 

British Petroleum (BP) Field at Khaskheli


Architect/Client

 

 


Status

 

Completed (2010)


Built-up Area

 

 


Project Brief

 

Turnkey
Scope of Works

 

Design Development & Execution of Electrical Works for Air Strip Lighting & Control Panel Installations

 

Wind Turbine Power Plant (50MW)

Project

Wind Turbine Power Plant

(50MW)


Location

 

Jhimpir, Sindh


Architect/Client

 

 


Status

 

Completed (2011)


Built-up Area

 

 


Project Brief

 

 


Scope of Works

 

Design & specifications vetting of Electrical, ELV Systems & Allied Works for utility/auxiliary buildings.

Kiran Sugar Mills


Project

 

Kiran Sugar Mills


Location

 

Rohri, Sukkar


Architect/Client

 

 


Status

 

Completed (2008)


Built-up Area

 

 

Project Brief

 


Mill House, Can Carrier, Clarification House, Boiler House, Process House, Cooling Tower & Generation Station
Scope of Works

 

Audit for Existing Electrical & Allied Works

 

ENGRO Corporations


Project

 

ENGRO Corporations


Location

 

Port Bin Qasim, Karachi


Architect/Client

 

 


Status

 

Completed (2008)


Built-up Area

 

 


Project Brief

 

Turnkey
Scope of Works

 

Excavation & Laying of Electrical Under-Ground Cables from Engro Woo-Pack to Engro Chemicals

 

Soorty Denim Mill


Project

 

Soorty Denim Mill


Location

 

National Highway, Karachi


Architect/Client

 

 


Status

 

Completed (2007)


Built-up Area

 

11,095 SFT


Project Brief

 

Turnkey
Scope of Works

 

Execution of Electrical, ELV Systems, Allied Works

 

Tethyan Copper Company (TCC) Head Office


Project

Tethyan Copper Company (TCC) Head Office


Location

Tipu Sultan Road, Karachi


Architect/Client

 

 


Status

 

Completed (2007)


Built-up Area

 

 


Project Brief

 

 
Scope of Works

 

Design Development of Lightning Protection Systems (LPS), Allied Works & Tender Documentation

 

Engro Chemical Pakistan (Pvt.) Ltd.


Project

 

Engro Chemical Pakistan (Pvt.) Ltd.


Location

 

Daharki


Architect/Client

 

 


Status

 

Completed (2007)


Built-up Area

 

 


Project Brief

 

New Wells & Canal
Scope of Works

 

Design Development, Tender Documentation of Electrical Over Head MV & LV Network for Clarifier to New Wells

 

The Forum Building


Project

 

The Forum Building


Location

 

Khayabane-e-Jami, Clifton, Karachi


Architect/Client

 

 


Status

 

Completed (2006)


Built-up Area

 

 


Project Brief

 

 
Scope of Works

 

Design Development of Electrical Load Enhancement, Up-Gradation of K-Electric Power & Standby Generation

 

Deewan Cements - Formerly Pak Land Cements


Project

Deewan Cements – Formerly Pak Land Cements


Location

Dhabeji


Architect/Client

 


Status

Completed (2007)


Built-up Area

 


Project Brief

Raw Mill Grinding, Raw Mill Reportioning, Stacker & Reclaimer Area


Scope of Works

 

Preparation of Cable & Tray Schedule for Instruments Power & Control Cables

Oil Tanking Petroleum Terminal


Project

 

Oil Tanking Petroleum Terminal


Location

 

Port Qasim Industrial Area, Karachi


Architect/Client

 

 


Status

 

Completed (2007)


Built-up Area

 

 


Project Brief

 

Turnkey


Scope of Works

 

Supply & Installation of Electrical Distribution Boards & Panels

IBA K-Electric Power Supply & Make Shift Arrangements with Generators & Sub-Stations


Project

 

IBA K-Electric Power Supply & Make Shift Arrangements with Generators & Sub-Stations


Location

 

Main Campus, Karachi


Architect/Client

 

 


Status

 

Completed (2010)


Built-up Area

 

 


Project Brief

 

 


Scope of Works

 

Design Development of Electrical Infrastructure, Allied Works, Tender Documentation & Top Supervision

Fauji Oil Terminal & Distribution Company Ltd (FOTCO)


Project

 

Fauji Oil Terminal & Distribution Company Ltd (FOTCO)


Location

 

Port Bin Qasim Karachi


Architect/Client

 


Status

 

Completed (2009)


Built-up Area

 

 


Project Brief

 

 


Scope of Works

 

Detail Engineering, Preparation of BOQ, Cost Estimation & Preparation of Technical Submittals for Electrical, ELV Systems, Security Systems & Allied Works